General Description
Raw materials will be loaded to the hopper by excavator or loader.Water flushing system is installed in the hopper so as to make raw material flow evenly into trommel screen for classification. Inside the trommel screen are two high pressure water spraying pipe for separation. Materials under 6mm and water will flow into sluices at both sides.Gravels will be removed from the conveyor belt at the end of trommel screen.
At the end of the processing work every day, just take the rubber mat out and wash it then heavy metal with little sand will be got.
Advantage and Feature
1. The main frame is fully welded
2. Equipped with heavy duty slide with wear proof backplate
3. Easy to move the machine
4. Tailing belt conveyor and trommel driven by motor, speed adjusted by transducer
5. Reinforced spray pipe in the hopper
6. Traction handles are equipped both in the front and back part
7. High placer gold recovery, especially for fine particle and sheet placer gold
8. Gold recovery by mat which is on the sluice, not easy to be hardened
9. Lower operating and maintenance cost
10. The equipment is particularly suitable for the remote areas.
Specifications
TGM1800-Gold Trommel Screen | ||
Model | TGM-1800 | |
Size | Overall Length | 21.4(including 11m belt conveyor) |
Overall Width | 11.1m(including sluice) | |
Overall Height | 5.05m | |
Processing Capacity | 150-200 m 3 /h | |
Screen Area | 22 ㎡ | |
Tommel Diameter | 1800 mm | |
Sluice Area | 2*9 ㎡ | |
Gold Processing Mat | Rubber mat | |
Trommel Mesh | 6.3 mm( can be chosen) | |
Hopper | Board thickness 8 mm,6mm rubber lining | |
Belt Conveyor Power | 7.5 kw - 4 p | |
Trommel Power | 15 kw - 4 p | |
Power set | Diesel | |
Water Pump | 12 inch | |
Water Flow / Lift | 1000 m 3 /h,32m | |
Rated Power / Speed | 150kw 1500 r/min | |
Operator | 1 person | |
Fuel Consumption | 190kw * 0.178L =33.82 L/Hour |
Address: Qingdao International Innovation Park,Shandong,China
E-mail: sales@relong-tech.com
Tel: +86 186 6170 5879
WhatsApp: +86 186 6170 5879