sales@relong-tech.com +86 186 6170 5879
sales@relong-tech.com +86 186 6170 5879
RL-8195D
Availability: | |
---|---|
Quantity: | |
This 8 inch commercial dredge is ideal for gold and gem recovery.These dredges can be quickly and easily broken down into small components where two men can transport the dredge manually.
The sluice is equipped with a winch leveling system for precise tilt and sluice box adjustement. This model is equipped with our world-famous rubber mat that is designed for superior gold recovery.
1. The dredge can be quickly and easily broken down into small components where two men can transport the dredge manually;
2. It has large carpeted walkways on the decks that can accommodate several divers and provide ease of access around all working parts of the dredge.
3. The sluice box sets at the surface of the water to reduce the water lift and increase suction power, winch leveling system for precise tilt and sluice box adjustment;
4. Equipped with world-famous rubber mat that is designed for superior gold recovery;
5. The suction system is equipped with an oversized power jet and twin eductor systems to reduce the occurrence of rock jams;
6. The frames have been reinforced for a more stable working platform;
7. The original T80 air compressor can supply air for divers.
Gold Dredge | |||||||||||
Size | Model | Pump/Power | Air compressor | Sluice Size(cm) | Max Dredging Depth | Capacity(m³) | Fuel Consumption (L) | Suction Hose/Length | Pontoon (cm) | Net weight | Packed Weight |
2 inch | RL-2004SNF | DW100/HONGDA GXH50 | None | 90*25 | 3m | 1m³/h | 0.91L/H | 2'' * 5m | 100*68*20 | 29kg | 39kg |
2.5 inch | RL-2604HPJ | DW160/MIT SU GT400 | None | 122*30 | 6m | 2m³/h | 1.3L | 2.5'' * 6m | 160*108*31 | 59kg | 102kg |
2.5 inch | RL-2604HCPJ | DW160/MITSU GT400 | T-80 | 122*30 | 6m | 2m³/h | 1.3L | 2.5'' * 6m | 160*108*31 | 70kg | 115kg |
3 inch | RL-3500PH | DW180 /GX200 6.5 | None | 122*35 | 6m | 3m³/h | 1.7L/H | 3'' * 6m | 160*96*35 | 75kg | 120kg |
3 inch | RL-3505PH | DW180 /GX200 6.5 | T-80 | 122*35 | 6m | 3m³/h | 1.7L/H | 3'' * 6m | 160*96*35 | 86kg | 131kg |
4 inch | RL-4500PH | DW180/GX200 6.5 | None | 122*40 | 6m | 4m³/h | 1.7L/H | 4'' * 6m | 160*100*35 | 85kg | 125kg |
4 inch | RL-4505PH | DW180/GX200 6.5 | T80 | 122*40 | 6m | 4m³/h | 1.7L/H | 4'' * 6m | 160*100*35 | 96kg | 136kg |
5 inch | RL-5211HP | DW180/GX200*2 sets | T-80 | 170*50 | 12m | 9m³/h | 3.4L/H | 5'' * 7m | 237*114*40 | 182kg | 227kg |
6 inch | RL-6211M | DW180/GX200*2 sets | T-80 | 170*55 | 8m | 12m³/h | 3.4L/H | 6'' * 7m | 240*120*40 | 200kg | 250kg |
6 inch | RL-6246V | JL 350/23hp | K263 | 360*65 | 18m | 14m³/h | 4L/H | 6'' * 10m | 465*250*73 | 800kg | 1050kg |
8 inch | RL-8246VE | JL 350/23hp | K263 | 480*70 | 10m | 19m³/h | 9L/H | 8'' * 12m | 620*270*83 | 860kg | 1050kg |
8 inch | RL-8140K | JL 1500/40hp | K263 | 480*70 | 12m | 19m³/h | 9L/H | 8'' * 12m | 620*270*83 | 890kg | 1100kg |
8 inch | RL-8160D | JL 1500/60hp Diesel | K263 | 600*75 | 15m | 23m³/h | 7L/H | 8'' * 12m | 775*275*83 | 1800kg | 20' Contanier * 1 |
8 inch | RL-8195D | JL 1500/95hp Diesel*2 | K263*2 | 600*75 | 24m | 26m³/h | 12L/H | 8'' * 12m | 775*275*83 | 2150kg |
This 8 inch commercial dredge is ideal for gold and gem recovery.These dredges can be quickly and easily broken down into small components where two men can transport the dredge manually.
The sluice is equipped with a winch leveling system for precise tilt and sluice box adjustement. This model is equipped with our world-famous rubber mat that is designed for superior gold recovery.
1. The dredge can be quickly and easily broken down into small components where two men can transport the dredge manually;
2. It has large carpeted walkways on the decks that can accommodate several divers and provide ease of access around all working parts of the dredge.
3. The sluice box sets at the surface of the water to reduce the water lift and increase suction power, winch leveling system for precise tilt and sluice box adjustment;
4. Equipped with world-famous rubber mat that is designed for superior gold recovery;
5. The suction system is equipped with an oversized power jet and twin eductor systems to reduce the occurrence of rock jams;
6. The frames have been reinforced for a more stable working platform;
7. The original T80 air compressor can supply air for divers.
Gold Dredge | |||||||||||
Size | Model | Pump/Power | Air compressor | Sluice Size(cm) | Max Dredging Depth | Capacity(m³) | Fuel Consumption (L) | Suction Hose/Length | Pontoon (cm) | Net weight | Packed Weight |
2 inch | RL-2004SNF | DW100/HONGDA GXH50 | None | 90*25 | 3m | 1m³/h | 0.91L/H | 2'' * 5m | 100*68*20 | 29kg | 39kg |
2.5 inch | RL-2604HPJ | DW160/MIT SU GT400 | None | 122*30 | 6m | 2m³/h | 1.3L | 2.5'' * 6m | 160*108*31 | 59kg | 102kg |
2.5 inch | RL-2604HCPJ | DW160/MITSU GT400 | T-80 | 122*30 | 6m | 2m³/h | 1.3L | 2.5'' * 6m | 160*108*31 | 70kg | 115kg |
3 inch | RL-3500PH | DW180 /GX200 6.5 | None | 122*35 | 6m | 3m³/h | 1.7L/H | 3'' * 6m | 160*96*35 | 75kg | 120kg |
3 inch | RL-3505PH | DW180 /GX200 6.5 | T-80 | 122*35 | 6m | 3m³/h | 1.7L/H | 3'' * 6m | 160*96*35 | 86kg | 131kg |
4 inch | RL-4500PH | DW180/GX200 6.5 | None | 122*40 | 6m | 4m³/h | 1.7L/H | 4'' * 6m | 160*100*35 | 85kg | 125kg |
4 inch | RL-4505PH | DW180/GX200 6.5 | T80 | 122*40 | 6m | 4m³/h | 1.7L/H | 4'' * 6m | 160*100*35 | 96kg | 136kg |
5 inch | RL-5211HP | DW180/GX200*2 sets | T-80 | 170*50 | 12m | 9m³/h | 3.4L/H | 5'' * 7m | 237*114*40 | 182kg | 227kg |
6 inch | RL-6211M | DW180/GX200*2 sets | T-80 | 170*55 | 8m | 12m³/h | 3.4L/H | 6'' * 7m | 240*120*40 | 200kg | 250kg |
6 inch | RL-6246V | JL 350/23hp | K263 | 360*65 | 18m | 14m³/h | 4L/H | 6'' * 10m | 465*250*73 | 800kg | 1050kg |
8 inch | RL-8246VE | JL 350/23hp | K263 | 480*70 | 10m | 19m³/h | 9L/H | 8'' * 12m | 620*270*83 | 860kg | 1050kg |
8 inch | RL-8140K | JL 1500/40hp | K263 | 480*70 | 12m | 19m³/h | 9L/H | 8'' * 12m | 620*270*83 | 890kg | 1100kg |
8 inch | RL-8160D | JL 1500/60hp Diesel | K263 | 600*75 | 15m | 23m³/h | 7L/H | 8'' * 12m | 775*275*83 | 1800kg | 20' Contanier * 1 |
8 inch | RL-8195D | JL 1500/95hp Diesel*2 | K263*2 | 600*75 | 24m | 26m³/h | 12L/H | 8'' * 12m | 775*275*83 | 2150kg |
Using the Power Jet Gold Dredging Machine from Relong Technology is a straightforward process designed to maximize efficiency and gold recovery. Here’s a detailed guide on how to operate this advanced piece of equipment:
Select the Right Location: Choose a site with a good concentration of alluvial gold. Ensure the area is accessible and safe for dredging operations.
Assemble the Dredge: Follow the manufacturer’s instructions to assemble the dredge. Ensure all components, including the power jet, sluice box, and hose, are securely connected.
Check Equipment: Inspect all parts for any damage or wear. Make sure the power jet is clean and free of obstructions.
Prime the Pump: Fill the pump with water to prime it. This is crucial for creating the necessary suction.
Position the Dredge: Place the dredge in the water source, ensuring the sluice box is stable and level. The power jet should be positioned at the end of the suction hose, just before the sluice box.
Start the Pump: Turn on the pump to start the water flow. The power jet will create a suction force that pulls water, gravel, and gold into the hose.
Begin Dredging: Guide the suction nozzle through the gravel and sediment on the riverbed. The power jet’s design ensures that material is “pulled” up the hose, reducing the risk of blockages1.
Monitor the Sluice Box: Keep an eye on the sluice box to ensure that the material flows evenly. The header box will dampen the rush of water and gravel, allowing the sluice to separate the gold from the worthless material2.
Regular Checks: Periodically stop the dredge to check for and clear any blockages in the hose or power jet. Ensure the pump is running smoothly and efficiently.
Clean the Sluice Box: Regularly clean the sluice box to remove accumulated gravel and extract the trapped gold. This will maintain optimal performance and prevent clogs.
Safety First: Always wear appropriate safety gear, including goggles and gloves. Be aware of your surroundings and avoid dredging in areas with heavy currents or unstable terrain.
Stop the Pump: Once you’ve finished dredging, turn off the pump and disconnect the power source.
Clean the Equipment: Thoroughly clean all parts of the dredge, especially the power jet and sluice box, to remove any remaining debris and prevent corrosion.
Disassemble and Store: Carefully disassemble the dredge and store all components in a safe, dry place to ensure longevity.
By following these steps, you can effectively operate the Power Jet Gold Dredging Machine from Relong Technology, ensuring optimal gold recovery and equipment durability. For more detailed information and specific instructions, visit Relong Technology.
Using the Power Jet Gold Dredging Machine from Relong Technology is a straightforward process designed to maximize efficiency and gold recovery. Here’s a detailed guide on how to operate this advanced piece of equipment:
Select the Right Location: Choose a site with a good concentration of alluvial gold. Ensure the area is accessible and safe for dredging operations.
Assemble the Dredge: Follow the manufacturer’s instructions to assemble the dredge. Ensure all components, including the power jet, sluice box, and hose, are securely connected.
Check Equipment: Inspect all parts for any damage or wear. Make sure the power jet is clean and free of obstructions.
Prime the Pump: Fill the pump with water to prime it. This is crucial for creating the necessary suction.
Position the Dredge: Place the dredge in the water source, ensuring the sluice box is stable and level. The power jet should be positioned at the end of the suction hose, just before the sluice box.
Start the Pump: Turn on the pump to start the water flow. The power jet will create a suction force that pulls water, gravel, and gold into the hose.
Begin Dredging: Guide the suction nozzle through the gravel and sediment on the riverbed. The power jet’s design ensures that material is “pulled” up the hose, reducing the risk of blockages1.
Monitor the Sluice Box: Keep an eye on the sluice box to ensure that the material flows evenly. The header box will dampen the rush of water and gravel, allowing the sluice to separate the gold from the worthless material2.
Regular Checks: Periodically stop the dredge to check for and clear any blockages in the hose or power jet. Ensure the pump is running smoothly and efficiently.
Clean the Sluice Box: Regularly clean the sluice box to remove accumulated gravel and extract the trapped gold. This will maintain optimal performance and prevent clogs.
Safety First: Always wear appropriate safety gear, including goggles and gloves. Be aware of your surroundings and avoid dredging in areas with heavy currents or unstable terrain.
Stop the Pump: Once you’ve finished dredging, turn off the pump and disconnect the power source.
Clean the Equipment: Thoroughly clean all parts of the dredge, especially the power jet and sluice box, to remove any remaining debris and prevent corrosion.
Disassemble and Store: Carefully disassemble the dredge and store all components in a safe, dry place to ensure longevity.
By following these steps, you can effectively operate the Power Jet Gold Dredging Machine from Relong Technology, ensuring optimal gold recovery and equipment durability. For more detailed information and specific instructions, visit Relong Technology.
Address: Qingdao International Innovation Park,Shandong,China
E-mail: sales@relong-tech.com
Tel: +86 186 6170 5879
WhatsApp: +86 186 6170 5879